River Bend Solar

Prefabricated control room installation of 166/34.5kv Substation. High Voltage Sub Distribution Station.

Specs. Exceeding Expectations.

Location: Florence, AL

General Contractor: Blattner Energy

Value: 3.0 M

Duration: 6 Months