Majestic Wind Farm 80MW - Collection System, Tower Wiring and Substation

Design-Build of an 80MW windfarm including Interconnect, Substation, Underground Collection System, Tower Foundations and Tower Wiring. Project comprised of 53 GE 1.5 MW Turbines.

Specs. Exceeding Expectations.

Location: Panhandle, Texas

General Contractor: Mortenson

Value: $12.0 M

Duration: 7 Months