Little Pringle Wind Farm 20 MW - Collection System & Substation

Design-Build of a 20 mega-watt farm consisting of 10 turbines that included 2 Utility Interconnects, 2 34.5v Underground Collection Systems, Tower Foundations and Tower Wiring.

Specs. Exceeding Expectations.

Location: Stinnet, Texas

General Contractor: Balfour Beatty Construction

Value: $4.0 M

Duration: 2.9 Months